How SureTrace engagements play out on real sites
Published engagements that walk through the project overview, the problem, the multi-method sweep we ran, and what the owner walked away with. Each study follows the same three-phase framework — pre-field intelligence, field detection sweep, and diligence plus verification — and shows the decisions a real program team made along the way.
Engagement notes from the field
Each study below is a real SureTrace engagement, written so a procurement committee or a program manager can see the shape of the work and the decisions made along the way. New studies appear here as we close them.
Regional health system running multi-site capital work where the 811 ticket covered public mains only. SureTrace ran a multi-method sweep and cleared the missing private-side picture before excavation started.
Municipal water department running multi-block capital work where the 811 ticket split the right-of-way. SureTrace ran pre-excavation sweeps that caught abandoned laterals before they read as live.
University upgrading aging underground steam and condensate mains beneath the academic quad; 811 stopped at the perimeter and the lab feeds sat inside the planned excavation corridor.
Have a site that needs this kind of answer?
Send a brief outline of the footprint and the planned work and we'll come back inside two business days with the engagement shape, the deliverables, and the indicative pricing that fits.